MIL-DTL-23581B(SH)
h. Chain and/or belt drive adjustment mechanisms are configured to provide proper tension and prevent
slippage under normal operation.
i.
Bearings, gears, and shafts are properly designed, aligned, and fitted for durable operation.
j.
Lubrication fittings are fitted where necessary and are adequate for purpose intended.
k.
Fastenings are adequate and accomplish the purpose for which intended.
4. VERIFICATION
4.1 Classification of inspections. The inspection requirements specified herein are classified as follows:
a.
First article inspection (see 4.3).
b.
Conformance inspection (see 4.4).
4.2 Inspection conditions. Unless otherwise specified in the contract or order, all inspections shall be
performed in accordance with the test conditions specified in this specification.
4.3 First article inspection. First article inspection shall be performed on the drying tumbler when a first article
sample is required (see 3.1). First article inspection shall consist of the examinations specified in table I and tests
specified in 4.3.2 and 4.3.3.
TABLE I. Classification of defects.
Classification
Examine
Defect (requirement)
Major
Minor
Construction materials not as specified (see
X
Material
3.3 & 3.5.1).
X
Design not as specified (see 3.4.1 and
Design, general
3.4.2).
X
Temperature
Not as specified (see 3.6.14.3.1).
control
X
Not provided, not as specified (see
Indicator light
3.6.14.3.1).
X
Not provided, not as specified (see
Timer
3.6.14.3.2).
X
Door interlock
Not provided, not as specified (see 3.6.3).
X
Not provided, not as specified (see
Timed cooldown
3.6.14.3.2).
X
Machine not designed for 16 pounds dry
Capacity and size
weight capacity (see 3.4.2).
X
Machine exceeds dimensions (see 3.6.13).
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business